![]()

![]()
COMPLETION DATE: 1998
CONSTRUCTION COST: $650,000
![]()
![]()
![]()
![]()
![]()
The architecture of the new Fellowship Hall blends with the existing sanctuary building in style, material and design. The new square cross and entry design provide a completeness to the church atmosphere and in harmony with the surrounding community. The structure consist of brick with concrete masonry block backing, Exterior Insulated Finish System (EIFS) base, sloped asphalt roofing, poured concrete on metal deck and steel joists with insulated semi-circular aluminum windows.
Move of God Church, Inc.